|
Appendix A: SWPPP Template
Instructions
To help you develop the narrative section of your construction site SWPPP, EPA has created this electronic SWPPP template. The template is designed to help guide you through the SWPPP development process and help ensure that your SWPPP addresses all the necessary elements stated in your construction general permit. You should use this template with EPA’s guidance on Developing Your Stormwater Pollution Prevention Plan. Both are available on EPA’s website at www.epa.gov/npdes/swpppguide
This template covers the SWPPP elements that most state construction general permits require, however, you are strongly encouraged to customize this template. There are two major reasons to customize this template:
· To reflect the terms and conditions of your construction general permit
· To reflect the conditions at your site
Some states might have their own SWPPP template. If so, use the state-suggested format. In such cases, this document and its template might provide useful background information.
Using the SWPPP Template
Each section of this template includes “instructions” and space for “project information.” You should read the instructions for each section as you complete the project information. This template was developed in Word so that you can easily add tables and additional text. Some sections may require only a brief description while others may require several pages of explanation.
Tips for completing the SWPPP template
· If there is more than one construction operator for your project, consider coordinating development of your SWPPP with the other operators.
· Multiple operators may share the same SWPPP, but make sure that responsibilities are clearly described.
· Modify this SWPPP template so that it addresses the requirements in your construction general permit and meets the needs of your project. Consider adding permit citations in the SWPPP when you address a specific permit requirement.
Stormwater Pollution Prevention Plan
For:
Insert Project Name
Insert Project Site Location/Address
Insert City, State, Zip Code
Insert Project Site Telephone Number (if applicable)
Operator(s):
Insert Company or Organization Name
Insert Name
Insert Address
Insert City, State, Zip Code
Insert Telephone Number
Insert Fax/Email
Stormwater Manager and SWPPP Contact(s):
Insert Company or Organization Name
Insert Name
Insert Address
Insert City, State, Zip Code
Insert Telephone Number
Insert Fax/Email
SWPPP Preparation Date:
Estimated Project Dates:
Start of Construction: __ __ / __ __ / __ __ __ __
Completion of Construction: __ __ / __ __ / __ __ __ __
Table of Contents
Instructions:
· In this section you can gather some basic site information that will be helpful to you later when you file for permit coverage.
· For more information, see Developing Your Stormwater Pollution Prevention Plan: A SWPPP Guide for Construction Sites (also known as the “SWPPP Guide”), Chapter 2
· Detailed information on determining your site’s latitude and longitude can be found at www.epa.gov/npdes/stormwater/latlong
Project Information:
Project/Site Name: ______________________________________________________________
Project Street/Location: __________________________________________________________
City: _____________________________ State: ____________ Zip Code: _________________
County or Similar Subdivision: ____________________________________________________
Latitude/Longitude (Use one of three possible formats, and specify method)
Latitude: Longitude:
1. _ _ º _ _ ' _ _ '' N (degrees, minutes, seconds) 1. _ _ º _ _ ' _ _ '' W (degrees, minutes, seconds)
2. _ _ º _ _ . _ _ ' N (degrees, minutes, decimal) 2. _ _ º _ _ . _ _ ' W (degrees, minutes, decimal)
3. _ _ . _ _ _ _ º N (decimal) 3. _ _ . _ _ _ _ º W (decimal)
Method for determining latitude/longitude:
USGS topographic map (specify scale: ____________) EPA Web site GPS
Other (please specify):_________________________________________________________
Is the project located in Indian country? Yes No
If yes, name of Reservation, or if not part of a Reservation, indicate "not applicable." _________
_____________________________________________________________________________
Is this project considered a federal facility? Yes No
NPDES project or permit tracking number:________________________________
(This is the unique identifying number assigned to your project by your permitting authority after you have applied for coverage under the appropriate NPDES construction general permit.)
Instructions:
· List the operator(s), project managers, stormwater manager, and person or organization that prepared the SWPPP. Indicate respective responsibilities, where appropriate.
· Also, list subcontractors expected to work on-site. Notify subcontractors of stormwater requirements applicable to their work.
· See SWPPP Guide, Chapter 2.B. and your construction general permit for the definition of operator.
Project Information:
Operator(s):
Insert Company or Organization Name
Insert Name
Insert Address
Insert City, State, Zip Code
Insert Telephone Number
Insert Fax/Email
Insert area of control (if more than one operator at site)
Repeat as necessary
Project Manager(s) or Site Supervisor(s):
Insert Name
Insert Company or Organization Name
Insert Address
Insert City, State, Zip Code
Insert Telephone Number
Insert Fax/Email
Insert area of control (if more than one operator at site)
Repeat as necessary
Stormwater Manager and SWPPP Contact(s):
Insert Name
Insert Company or Organization Name
Insert Address
Insert City, State, Zip Code
Insert Telephone Number
Insert Fax/Email (Optional)
Repeat as necessary
This SWPPP Was Prepared By:
Insert Name
Insert Company or Organization Name
Insert Address
Insert City, State, Zip Code
Insert Telephone Number
Insert Fax/Email
Subcontractor(s):
Insert Company or Organization Name
Insert Name
Insert Address
Insert City, State, Zip Code
Insert Telephone Number
Insert Fax/Email
Repeat as necessary
Emergency 24 hour contact:
Insert Name
Insert Telephone Number
Instructions:
· Briefly describe the nature of the construction activity and approximate timeframes (one or more paragraphs, depending on the nature and complexity of the project).
· See SWPPP Guide, Chapter 3.A. for more information.
Project Information:
· Describe the general scope of the work for the project, major phases of construction, etc:
INSERT TEXT HERE
What is the function of the construction activity?
Residential Commercial Industrial Road Construction
Linear Utility
Other (please specify):_________________________________________________________
Estimated Project Start Date: __ __ / __ __ / __ __ __ __
Estimated Project Completion Date: __ __ / __ __ / __ __ __ __
Instructions:
· Describe the existing soil conditions at the construction site including soil types, slopes and slope lengths, drainage patterns, and other topographic features that might affect erosion and sediment control.
· Also, note any historic site contamination evident from existing site features and known past usage of the site.
· This information should also be included on your site maps (See SWPPP Guide, Chapter 3.C.).
· For more information, see SWPPP Guide, Chapter 3.A. for more information.
Project Information:
Soil type(s):
· INSERT TEXT HERE
· INSERT TEXT HERE
Slopes (describe current slopes and note any changes due to grading or fill activities):
· INSERT TEXT HERE
· INSERT TEXT HERE
Drainage Patterns (describe current drainage patterns and note any changes dues to grading or fill activities):
· INSERT TEXT HERE
· INSERT TEXT HERE
Vegetation:
· INSERT TEXT HERE
· INSERT TEXT HERE
Other:
· INSERT TEXT HERE
· INSERT TEXT HERE
Instructions:
· Estimate the area to be disturbed by excavation, grading, or other construction activities, including dedicated off-site borrow and fill areas.
· Calculate the percentage of impervious surface area before and after construction
· Calculate the runoff coefficients before and after construction.
· For more information, see SWPPP Guide, Chapter 3.A. and Appendix C
Project Information:
The following are estimates of the construction site:
Total Project Area acres
Percentage impervious area before construction %
Runoff coefficient before construction
Percentage impervious area after construction %
Runoff coefficient after construction
Instructions:
· List the waterbody(s) that would receive stormwater from your site, including streams, rivers, lakes, coastal waters, and wetlands. Describe each as clearly as possible, such as Mill Creek, a tributary to the Potomac River, etc.
· Note any stream crossings, if applicable.
· List the storm sewer system or drainage system that stormwater from your site could discharge to and the waterbody(s) that it ultimately discharges to.
· If any of the waterbodies above are impaired and/or subject to TMDLs, please list the pollutants causing the impairment and any specific requirements in the TMDL(s) that are applicable to construction sites. Your SWPPP should specifically include measures to prevent the discharge of these pollutants.
· For more information, please see SWPPP Guide, Chapter 3.A. and 3.B.
· Also visit www.epa.gov/npdes/stormwater/tmdl for more information and a list of TMDL contacts and links by state.
Project Information:
Description of storm sewer systems: INSERT TEXT HERE
Description of impaired waters or waters subject to TMDLs: INSERT TEXT HERE
Instructions:
· Describe unique site features including streams, stream buffers, wetlands, specimen trees, natural vegetation, steep slopes, or highly erodible soils that are to be preserved.
· Describe measures to protect these features.
· Include these features and areas on your site maps.
· For more information, see SWPPP Guide, Chapter 3.A. and 3.B. for more information
Project Information:
Description of unique features and measures to protect them:
· INSERT TEXT OR TABLE HERE
Instructions:
· Identify and list all potential sources of sediment from construction materials and activities which may reasonably be expected to affect the quality of stormwater discharges from the construction site.
· Identify and list all potential sources of pollution, other than sediment, from construction materials and activities which may reasonably be expected to affect the quality of stormwater discharges from the construction site.
· See SWPPP Guide, Chapter 3.A. for more information.
Project Information:
Potentials sources of sediment to stormwater runoff:
· INSERT TEXT OR TABLE HERE
· INSERT TEXT HERE
Potential pollutants and sources, other than sediment, to stormwater runoff:
· INSERT TEXT OR TABLE HERE
· INSERT TEXT HERE
Instructions:
· Before commencing construction, determine whether endangered or threatened species or their critical habitats are on or near your site.
· Adapt this section as needed for state or tribal endangered species requirements.
· For more information on this topic, see SWPPP Guide, Chapter 3.B.
· Additional information related to EPA’s Construction General Permit can be found at www.epa.gov/npdes/stormwater/esa
Project Information:
Are endangered or threatened species and critical habitats on or near the project area?
Yes No
Describe how this determination was made: INSERT TEXT HERE
If yes, describe the species and/or critical habitat: INSERT TEXT HERE
If yes, describe or refer to documentation which determines the likelihood of an impact on identified species and/or habitat and the steps taken to address that impact. (Note, if species are present on or near your project site, EPA strongly recommends that the site operator work closely with the appropriate field office of the U.S. Fish and Wildlife Service or National Marine Fisheries Service. Please contact a state or tribal official for concerns related to state or tribal listing of species.) INSERT TEXT HERE
Instructions:
· Before you begin construction, you should review federal and any applicable state, local, or tribal historic preservation laws and determine if there are historic sites on or near your project. If so, you may need to make adjustments to your construction plans or to your stormwater controls to ensure that these historic sites are not damaged.
· For more information see SWPPP Guide, Chapter 3.B or contact your state or tribal historic preservation officer.
Project Information:
Are there any historic sites on or near the construction site?
Yes No
· Describe how this determination was made: INSERT TEXT HERE
· If yes, describe or refer to documentation which determines the likelihood of an impact on this historic site and the steps taken to address that impact. INSERT TEXT HERE
Instructions:
· Attach at least two site maps. The first should show the undeveloped site and its current features. An additional map or maps should be created to show the developed site or the major phases of development, for more complicated sites.
These maps should include:
· Direction(s) of stormwater flow and approximate slopes before and after major grading activities
· Areas and timing of soil disturbance and areas that will not be disturbed
· Natural features to be preserved
· Locations of major structural and non-structural BMPs identified in the SWPPP
· Locations and timing of stabilization measures
· Locations of off-site material, waste, borrow, or equipment storage areas
· Locations of all waters of the U.S., including wetlands
· Locations where stormwater discharges to a surface water
· Locations of storm drain inlets
· Areas where final stabilization has been accomplished
· For more information, see SWPPP Guide, Chapter 3.C.
Project Information:
· Include the site maps with the SWPPP.
Instructions:
· Describe the BMPs that will be implemented to control pollutants in stormwater discharges. For each major activity identified:
Clearly describe appropriate control measures.
Describe the general sequence during the construction process in which the measures will be implemented.
Describe the maintenance and inspection procedures that will be undertaken for that specific BMP.
Include protocols, thresholds, and schedules for cleaning, repairing, or replacing damaged or failing BMPs.
Identify staff responsible for maintaining BMPs.
(If your SWPPP is shared by multiple operators, indicate the operator responsible for each BMP.)
· Categorize each BMP under one of the following 10 areas of BMP activity as described below:
Minimize disturbed area and protect natural features and soil
Phase Construction Activity
Control Stormwater flowing onto and through the project
Stabilize Soils
Protect Slopes
Protect Storm Drain Inlets
Establish perimeter controls and sediment barriers
Retain Sediment On-Site and Control Dewatering Practices
Establish Stabilized Construction Exits
Any Additional BMPs
· Note the location of each BMP on your site map(s).
· Any structural BMPs should have design specifications and details referred to and attached as appendices to the SWPPP.
· For more information, see SWPPP Guide, Chapter 4.
· Consult your state’s design manual or one of those listed in Appendix D of the SWPPP Guide.
· For more information or ideas on BMPs see EPA’s National Menu of BMPs http://www.epa.gov/npdes/stormwater/menuofbmps
Project Information:
1. Minimize Disturbed Area and Protect Natural Features and Soil:
Describe the areas that will be disturbed with each phase of construction and the methods (signs, fences, etc.) that you will use to protect those areas that should not be disturbed. Describe natural features identified earlier and how each will be protected during construction activity. Also describe how topsoil will be preserved. Include these areas and associated BMPs on your site map(s) also. (See SWPPP Guide, Chapter 4, ESC Principle 1 for more information.)
· INSERT Text or TABLE HERE, include inspection and maintenance schedules as appropriate and staff responsible for maintenance
· Phase Construction Activity:
Describe the intended construction sequencing and timing of major activities, including grading activities, road and utility installation, and building phases. (See SWPPP Guide, Chapter 4, ESC Principle 2 for more information.) It may be useful to develop a separate, detailed site map for each phase of construction.
Describe phase
Duration of phase (start date, end date)
List BMPs associated with this phase
List BMPs associated with this phase
Describe stabilization methods for this phase (describe any temporary stabilization methods that will be used before final stabilization)
Repeat as needed
Describe phase
Duration of phase (start date, end date)
List BMPs associated with this phase
List BMPs associated with this phase
Describe stabilization methods for this phase (describe any temporary stabilization methods that will be used before final stabilization)
Repeat as needed
2. Control Stormwater Flowing Onto and Through the Project:
Describe structural practices (i.e., diversions, berms, ditches, storage basins) including design specifications and details used to divert flows from exposed soils, retain or detain flows, or otherwise limit runoff and the discharge of pollutants from exposed areas of the site. (See SWPPP Guide, Chapter 4, ESC Principle 3 for more information.)
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff INSERT TEXT HERE
4. Stabilize Soils:
Describe controls (i.e., temporary seeding with native vegetation, hydroseeding, etc.) to stabilize exposed soils where construction activities have temporarily or permanently ceased. Also describe measures to control dust generation. Use of impervious surfaces for stabilization should be avoided whenever possible. (See SWPPP Guide, Chapter 4, ESC Principle 4 for more information.)
· BMP Description: INSERT TEXT HERE
Permanent Temporary
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
· BMP Description: INSERT TEXT HERE
Permanent Temporary
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
5. Protect Slopes:
Describe controls (i.e., erosion control blankets, tackifiers, etc.) including design specifications and details that will be implemented to protect all slopes. (See SWPPP Guide, Chapter 4, ESC Principle 5 for more information.)
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
6. Protect Storm Drain Inlets:
Describe controls (i.e., inserts, rock-filled bags, or block and gravel, etc.) including design specifications and details that will be implemented to protect all inlets receiving stormwater from the project during the entire duration of the project. (See SWPPP Guide, Chapter 4, ESC Principle 6 for more information.)
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
7. Establish perimeter controls and sediment barriers:
Describe structural practices (i.e., silt fences or fiber rolls) including design specifications and details to filter and trap sediment before it leaves the construction site. (See SWPPP Guide, Chapter 4, ESC Principle 7 for more information.)
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
8. Retain Sediment On-Site and Control Dewatering Practices:
Describe sediment control practices (i.e., sediment trap or sediment basin), including design specifications and details (volume, dimensions, outlet structure) that will be implemented at the construction site to retain sediments on-site. Describe dewatering practices that will be implemented if water must be removed from an area so that construction activity can continue. (See SWPPP Guide, Chapter 4, ESC Principle 8 for more information.)
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
·
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
9. Establish Stabilized Construction Exits:
Describe location(s) of vehicle entrance(s) and exit(s), procedures to remove accumulated sediment off-site (i.e., vehicle tracking), and stabilization practices (i.e., stone pads and/or wash racks) to minimize off-site vehicle tracking of sediments and discharges to stormwater. (See SWPPP Guide, Chapter 4, ESC Principle 9 for more information.)
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
10. Additional BMPs:
Describe additional BMPs that may not fit into the above categories.
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
Instructions:
· Describe the key good housekeeping and pollution prevention (P2) measures that will be implemented to control pollutants in stormwater.
· Categorize each good housekeeping and pollution prevention (P2) BMP under one of the following 7 categories and follow the instructions to SWPPP Guide your description:
Material Handling and Waste Management: Establish Proper Building Material Staging Areas:
Designate Washout Areas:
Establish proper equipment/vehicle fueling and maintenance practices:
Allowable non-stormwater discharges and control equipment/vehicle washing:
Spill Prevention and Control Plan:
Any Additional BMPs:
· For more information, see SWPPP Guide, Chapter 5.
· Consult your state’s design manual or resources in Appendix D of the SWPPP Guide.
· For more information or ideas on BMPs, see EPA’s National Menu of BMPs http://www.epa.gov/npdes/stormwater/menuofbmps
Project Information:
1. Material Handling and Waste Management:
Describe measures (i.e., trash disposal, sanitary wastes, recycling, and proper material handling) to prevent the discharge of solid materials to waters of the U.S., except as authorized by a permit issued under section 404 of the CWA. (See SWPPP Guide, Chapter 5, P2 Principle 1)
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
2. Establish Proper Building Material Staging Areas:
Describe construction materials expected to be stored on-site and procedures for storage of materials to minimize exposure of the materials to stormwater. (See SWPPP Guide, Chapter 5, P2 Principle 2 for more information.)
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
3. Designate Washout Areas:
Describe location(s) and controls to minimize the potential for stormwater pollution from washout areas for concrete mixers, paint, stucco, etc. (See SWPPP Guide, Chapter 5, P2 Principle 3 for more information.)
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
4. Establish proper equipment/vehicle fueling and maintenance practices:
Describe equipment/vehicle fueling and maintenance practices that will be implemented to control pollutants to stormwater (e.g., secondary containment, drip pans, spill kits, etc.) (See SWPPP Guide, Chapter 5, P2 Principle 4 for more information.)
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
5. Allowable non-stormwater discharges and control equipment/vehicle washing:
For the allowable non-stormwater discharge(s) associated with construction industrial activity identified, describe controls and measures that will be implemented at those sites to minimize pollutant discharges. (See SWPPP Guide, Chapter 5, P2 Principle 5 for more information.)
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
6. Spill Prevention and Control Plan:
Describe the spill prevention and control plan to include ways to reduce the chance of spills, stop the source of spills, contain and clean up spills, dispose of materials contaminated by spills, and train personnel responsible for spill prevention and control. (See SWPPP Guide, Chapter 5, P2 Principle 6 for more information.)
· INSERT TEXT HERE
7. Any Additional BMPs:
Describe any additional BMPs that don’t fit into the above categories. Indicate the problem they are intended to address.
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
Instructions:
· Identify all allowable sources of non-stormwater discharges (except flows from firefighting activities) that are not identified above.
· Identify measures used to eliminate or reduce these discharges and the BMPs used to prevent them from becoming contaminated.
· For more information, see SWPPP Guide, Chapter 3.A. Also, review your permit for exact details.
Project Information:
List allowable non-stormwater discharges and the measures used to eliminate or reduce them and to prevent them from becoming contaminated:
· INSERT TEXT HERE
Instructions:
· Describe all post-construction stormwater management measures that will be installed during the construction process to control pollutants in stormwater discharges after construction operations have been completed. Examples of post-construction BMPs include:
Biofilters Detention/retention devices
Earth dikes, drainage swales, and lined ditches
Infiltration Basins
Porous Pavement
Other proprietary permanent structural BMPs
Outlet protection/velocity dissipation devices
Slope protection
Vegetated strips and/or swales
· Identify any applicable federal, state, local, or tribal requirements for design or installation.
· Describe how low impact designs or smart growth considerations have been incorporated into the design.
· Any structural BMPs should have design specifications and details referred to and attached as appendices to the SWPPP.
· For more information on this topic, please refer to your state’s stormwater manual.
· You may also want to consult one of the references listed in Appendix D of the SWPPP Guide.
· Visit the post-construction section of EPA’s Menu of BMPs at: www.epa.gov/npes/menuofbmps
· Post-Construction annual reports are due to The City of Goodlettsville by July 1, on an annual basis.
Project Information:
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: INSERT TEXT HERE
· BMP Description: INSERT TEXT HERE
· Installation Schedule: INSERT TEXT HERE
· Maintenance and Inspection: INSERT TEXT HERE
· Responsible Staff: &nb |